is.\*:("0010-5317")
Results 1 to 25 of 1401
Selection :
Anyone for tennis? The new No.1 Court - wimbledonHALL, Tim.Concrete (London). 2004, Vol 38, Num 2, pp 40-42, issn 0010-5317, 3 p.Article
BP Sunbury: The final phaseOHLSON, Roger.Concrete (London). 2004, Vol 38, Num 6, pp 30-31, issn 0010-5317, 2 p.Article
Combined UniversitiesCOLE, Brian.Concrete (London). 2004, Vol 38, Num 7, pp 42-43, issn 0010-5317, 2 p.Article
Creating the classroom of the futureMACKENZIE, Andrew.Concrete (London). 2004, Vol 38, Num 7, issn 0010-5317, p. 16Article
Expanding the possibilities of concrete constructionMILLER, Robin.Concrete (London). 2004, Vol 38, Num 7, pp 20-21, issn 0010-5317, 2 p.Article
Formwork overcomes Korean bridge challengeWILLIAMS, Paul.Concrete (London). 2004, Vol 38, Num 3, pp 16-17, issn 0010-5317, 2 p.Article
Framing the sage: GatesheadDOBSON, Nick.Concrete (London). 2004, Vol 38, Num 1, pp 30-32, issn 0010-5317, 2 p.Article
No test card required: The BBC 'White City' developmentHALL, Tim; HAYES, Patrick.Concrete (London). 2004, Vol 38, Num 1, pp 10-13, issn 0010-5317, 4 p.Article
Plastic shrinkage reduction in concrete pavements due to the addition of both steel and polymer-modified fibresAGOSTINACCHIO, Michele; CUOMO, Gianluca.Concrete (London). 2004, Vol 38, Num 6, pp 44-46, issn 0010-5317, 3 p.Article
Recipe for concrete successBARRON, Noel.Concrete (London). 2004, Vol 38, Num 3, issn 0010-5317, p. 40Article
Reducing slab deflections in fast-track construction with the formwork strip modelISGREN, Christer; VOLLUM, Robert; WESSTER, Rod et al.Concrete (London). 2004, Vol 38, Num 1, pp 15-16, issn 0010-5317, 2 p.Article
Regenerating Glasgow with prefabricated formworkBUDGE, Stephen.Concrete (London). 2004, Vol 38, Num 3, pp 21-22, issn 0010-5317, 2 p.Article
Rivington and LostockBELL, Colin.Concrete (London). 2004, Vol 38, Num 4, pp 42-43, issn 0010-5317, 2 p.Article
Sustainable concrete constructionNIXON, Philip; QUILLIN, Keith; SOMERVILLE, George et al.Concrete (London). 2004, Vol 38, Num 3, pp 31-33, issn 0010-5317, 3 p.Article
Techniques of tilt-upSAUTER, Ed.Concrete (London). 2004, Vol 38, Num 3, pp 18-19, issn 0010-5317, 2 p.Article
The SKY's the limit for ready-mixed concreteWATSON, Neil.Concrete (London). 2004, Vol 38, Num 4, pp 11-13, issn 0010-5317, 3 p.Article
UK Insulating Concrete Formwork Association: A new era in concrete constructionGUO-HERITAGE, Pauline; WATSON, Neil.Concrete (London). 2004, Vol 38, Num 3, pp 6-9, issn 0010-5317, 4 p.Article
Clad rack for Quinn GlassEDDY, Darryl.Concrete (London). 2004, Vol 38, Num 8, pp 14-15, issn 0010-5317, 2 p.Article
Concrete in hydrocarbon fire: the proprietary passive solutionELLICOTT, Graham.Concrete (London). 2004, Vol 38, Num 10, pp 67-68, issn 0010-5317, 2 p.Article
Concrete sleepers make light workHOWITT, Murray.Concrete (London). 2004, Vol 38, Num 8, issn 0010-5317, p. 46Article
Experian Data Centre, Ruddington Fields Business Park, NottinghamConcrete (London). 2004, Vol 38, Num 10, pp 12-14, issn 0010-5317, 3 p.Article
Fire safety of concrete structures: Background to BS 8110 fire designLENNON, Tom.Concrete (London). 2004, Vol 38, Num 10, pp 63-64, issn 0010-5317, 2 p.Article
Foundations, joints and monitoring: the keys to pavement successARMITAQE, Robert.Concrete (London). 2004, Vol 38, Num 8, pp 51-52, issn 0010-5317, 2 p.Article
High-performance concrete for airfield pavementsDELCHAR, Andy.Concrete (London). 2004, Vol 38, Num 8, pp 49-50, issn 0010-5317, 2 p.Article
New tower on the blockECKER, Heinrich.Concrete (London). 2004, Vol 38, Num 10, pp 60-62, issn 0010-5317, 2 p.Article